InfraEn to Enhance Urban Mobility in Trichy as Design Partner

November 4, 2024 InfraEn to Enhance Urban Mobility in Trichy as Design Partner As Trichy’s chosen design partner for urban transportation, InfraEn will drive the design of road infrastructure that meets the demands of a growing urban population. This project aims to create a more accessible and efficient road network, setting a new benchmark for urban transportation in the region.

InfraEn Wins Contract to Supervise Salem UGSS Construction

November 4, 2024 InfraEn Wins Contract to Supervise Salem UGSS Construction InfraEn will lead construction supervision for Salem’s UGSS project, ensuring adherence to high-quality standards and efficient project execution. This award underscores InfraEn’s role in advancing urban sanitation infrastructure, with the Salem project set to boost the city’s sewerage capacity and reliability.

Transforming Waste to Energy—InfraEn Partners with Tandon Urban Solutions for Deonar Plant

November 4, 2024 Transforming Waste to Energy—InfraEn Partners with Tandon Urban Solutions for Deonar Plant In a major step toward sustainable waste management, InfraEn is collaborating with Tandon Urban Solutions to establish a Waste-to-Energy facility at Mumbai’s Deonar site. This plant will process municipal waste to generate clean energy, aligning with the city’s commitment to environmental progress.

InfraEn Awarded Contract for Sewerage System Evaluation in Tamil Nadu

November 4, 2024 InfraEn Awarded Contract for Sewerage System Evaluation in Tamil Nadu Recognized for its excellence in infrastructure management, InfraEn will undertake the performance assessment of Tamil Nadu’s underground sewerage systems. This award enables InfraEn to contribute to improved sanitation standards, supporting the state’s efforts in sustainable urban development.

InfraEn Drives Smart Metering Revolution in Tamil Nadu

November 4, 2024 InfraEn Drives Smart Metering Revolution in Tamil Nadu InfraEn is at the forefront of Tamil Nadu’s shift towards smart metering, bringing advanced metering infrastructure to optimize energy usage and boost efficiency. This initiative aims to empower consumers with real-time insights, enabling more sustainable energy management across the state.

InfraEn Leads 24×7 Water Supply Project for Chandigarh

24x7 Water Supply Project for Chandigarh

November 4, 2024 InfraEn Leads 24×7 Water Supply Project for Chandigarh InfraEn is engineering Chandigarh’s first-ever 24×7 water supply project, a transformative initiative aimed at delivering uninterrupted water access to the city’s residents. This project promises a robust, sustainable water network that will set new benchmarks for urban water management in India.

Awarded with performance assessment of Underground Sewerage Systems in Tamil Nadu

October 21, 2024 Awarded with performance assessment of Underground Sewerage Systems in Tamil Nadu The Government of Tamil Nadu has invited tenders for Consulting Services Performance Assessment of completed Underground Sewerage System (UGSS) in 51 towns in Tamil Nadu and suggest the feasibility for safe disposal of sludge from STPs under Tamil Nadu Climate Resilient Urban Development Program (TNCRUDP). Scope of work includes, Study the as constructed details of the system to arrive the capacities between designs and constructed, address the issues in the collection system, pumping / lift stations, pumping mains, STPs, treated used water disposal mains etc based on the secondary data and filed reconnaissance. Assess the UGSS coverage (covered and uncovered) based on the secondary data in the Project area. Assess the number of HSC provided and gap if any. InfraEn to measure the sewage flow at the inlet and outlet of the STPs (All the inlets to be measured if the STP has more than one inlet). Inference of the results to be submitted in the report. InfraEn to make their own arrangement to measure the flow with suitable non-destructive technology. 6. Sewage samples (24 hrs composite sample) to be collected at all inlets and outlets of the STPs and carryout the sewage sample analysis in the NABL accredited laboratory. Sewage quality parameters to be tested as per the discharge standards of CPCB, NGT, CPHEEO Manual etc. Assess the sewage treatment plant for its designed capacity and actual sewage is treated. Assess the performance of each unit in the STP based on the secondary data and visual inspection. Asses the performance of the sludge treatment as per the standards and disposal mechanism. InfraEn to suggest the safe disposal of sludge from STPs and suggest suitable the revenue generation mechanism for the treated sludge. The InfraEn shall assess the status of Consent from State Pollution Control Board, status of maintenance of logbooks, status of laboratory facility etc. The InfraEn shall assess the major deficiencies in the treatment plant and shall provide remedial measures. InfraEn shall assess biogas production, if any and its composition, operational status of gas utilization, Power generation etc. Assess the effective functioning of facilities created in accordance with stipulated performance standards. InfraEn to provide latest technological options for upgradation / improvements to the STPs to enhance the performance and capacity. InfraEn to provide the measures for the effective functioning of the entire system based on their analysis for each component of the UGSS. The InfraEn to assess the operation and maintenance mechanism of Sewage Treatment Plant, power requirement, status of power availability for uninterrupted and continuous running of STP, status of Skilled/Trained Manpower, annual expenditure on O&M. InfraEn to assess the IEC activities for the UGSS being done by the ULB. Through this project InfraEn has got the opportunity to understand the actual situation of Underground Sewerage System across Tamil Nadu and will be able to suggest for a sustainable model to cities.

InfraEn is catalysing smart water supply system in Tamil Nadu

October 21, 2024 InfraEn is catalysing smart water supply system in Tamil Nadu InfraEn has been appointed as the Consultancy service for “the preparation of Detailed Feasibility Report (DFR) and model Bid documents for Supply, delivery, installation of smart water meters in the head works, booster station, GLSRs, group sump, Panchayat sumps/OHTs where the supply is directly from pumping/ gravity main instead of from Panchayat sumps, receiving all the particulars from all smart water meters, and forming the centralized monitoring system where data from all smart meters are collected and made into actionable data for assessing billed quantity and automatic generation of billing purpose.” With this project, Tamil Nadu Water Supply and Drainage Board has intended to create a centralized monitoring system where data from all smart meters are collected and made into actionable data for assessing billed quantity and automatic generation of billing purpose. Scope of Work under this project includes utilization of the data available in TWAD board and undertake field trips to validate the data if necessary to arrive at the feasibility and modality of connecting electro-magnetic flow meters from headworks to beneficiaries for all CWSS under maintenance of TWAD Board with Geo-tagging. Arrive at the feasibility and modalities of arriving at suitable data transmission platforms to be installed near flow meters that transmit data wirelessly (IOT) to the proposed centralised monitoring system in TWAD Board headquarters. Data transmission Components and protocol to be implemented by keeping in view the sustainability of the system proposed and longevity of the data transmission system. Analyse the detailed feasibility of housing the proposed electromagnetic flow meters and the data transmission unit in a separate enclosure and provisions including power supply, network, etc., shall be added accordingly. Analyse the detailed feasibility and shall arrive at physical requirements of building centralised monitoring system in TWAD Board Head Office, Chennai. The consultant explore the feasibility and arrive at sufficient reporting formats at beneficiary wise, scheme wise, district wise, region wise the water quantity pumped at Head works and supplied at beneficiary level and help quantify the non- revenue water. Linking the existing billing system in TWAD Board Head office with the proposed system. Preparation of Detailed Feasibility Report, Bill of quantities, Specifications, Detailed Project Report etc., for Jal Jeevan Mission funded schemes separately. Suggesting suitable financing model to be implemented for the project, including preparation of Detailed Feasibility Report, Detailed Project Report, specifications, Bill of quantities for all the other projects. This project will be a game changer for smart management of the entire Water Supply system of Tamil Nadu and thereby creating a model for other states in the country.